Assuming the notch is already filled, calculate the additional discharge needed to flood onto the middle terrace. This a
Posted: Tue Jul 12, 2022 1:35 pm
Assuming the notch is already filled, calculate the additional discharge needed to flood onto the middle terrace. This additional discharge is: Fill the notch and flood the bottomland Additional needed to flood middle terrace Total needed to flood middle terrace O 12.5 m³/sec 50 m³/sec Event 98 m³/sec Profile Text 35 m Width (m) 8 m 35 m 8 m Depth (m) 5 m 3m Velocity (m/sec) 2.0 m/sec 2.6 m/sec Add discharges from above Calculated Discharge m/sec