Page 1 of 1

The standard factory overhead rate is $7.50 per machine hour (56.20 for variable factory overhead and $1.30 for fixed fa

Posted: Tue Apr 26, 2022 10:13 am
by answerhappygod
The Standard Factory Overhead Rate Is 7 50 Per Machine Hour 56 20 For Variable Factory Overhead And 1 30 For Fixed Fa 1
The Standard Factory Overhead Rate Is 7 50 Per Machine Hour 56 20 For Variable Factory Overhead And 1 30 For Fixed Fa 1 (22.23 KiB) Viewed 29 times
The standard factory overhead rate is $7.50 per machine hour (56.20 for variable factory overhead and $1.30 for fixed factory overhead based on 100% of normal capacity of 80,000 machine hours. The standard cost and the actual cost of factory overhead for the production of 15,000 units during August were as follows: $360,000 Actual: Variable factory overhond Fixed factory overhead 104,000 Standard hours allowed for units produced: 60,000 hours What is the amount of the fixels factory overhead volume variance? O a. S14,000 unfavorable b. 26.000 unfavorable O c $12,000 favorable O d. S12.000 unfavorable