3) Considering the PI controller given by Ge(s)= 5(1+1/2s); a) sketch its Bode diagram manually, b) show frequency respo
Posted: Tue Jul 12, 2022 8:46 am
3) Considering the PI controller given by Ge(s)= 5(1+1/2s); a) sketch its Bode diagram manually, b) show frequency response to harmonic input, and write MATLAB code to draw Bode diagrams and Nyquist plot of this PI controller.