with clear height = 7m, and the covering material used is sandwich panels. The crane total loads = (10 t) with spacing b
Posted: Mon Apr 25, 2022 9:25 am
with clear height = 7m, and the covering material used is sandwich panels. The crane total loads = (10 t) with spacing between wheels (1 m). Steel
used is steel 37?
used is steel 37?