1. Go to sheet C.3- Find the proposed contour line number 701; highlight it in a red color. It will be on the right draw

Posted: Mon Jul 11, 2022 2:43 pm
by answerhappygod
1 Go To Sheet C 3 Find The Proposed Contour Line Number 701 Highlight It In A Red Color It Will Be On The Right Draw 1
1 Go To Sheet C 3 Find The Proposed Contour Line Number 701 Highlight It In A Red Color It Will Be On The Right Draw 1 (55.07 KiB) Viewed 68 times
1 Go To Sheet C 3 Find The Proposed Contour Line Number 701 Highlight It In A Red Color It Will Be On The Right Draw 2
1 Go To Sheet C 3 Find The Proposed Contour Line Number 701 Highlight It In A Red Color It Will Be On The Right Draw 2 (55.48 KiB) Viewed 68 times
1. Go to sheet C.3- Find the proposed contour line number 701; highlight it in a red color. It will be on the right drawing. 2. Find the existing contour line number 701 and highlight it in a blue color. If the existing contour line (the dotted line) has less value than the finished floor of the building; this means that the building is higher than the existing land surface, which means we need to provide fill materials to raise the building before starting the construction process. 3. Find the proposed finish floor elevation (FFE) of the new building, highlight it, what is required? (cut or fill). 4. Highlight all the small arrows in the site plan, which represent the slopes in the site plan. 5. The slope in the different roads in the car parking lots is also shown in this drawing (such as 0.6% with a small arrow underneath it). Find the slope of the different roads in the car parking lot and highlight them. Now determine the steepest slope in the paved road. Circle it in orange.
EAST 91st STREET SOUTH ONS ARE PRICOTSON 10.7144 CI CROSION CONTROL PLAN THE TIM Les forc 4400 EAST 9181 STREET SOUTH UNISE myrka 40² AME zelf GRADING AND DRAINAGE PLAN FOR Hoe om d GRADING AND DRAINAGE PLAN AND EROSION CONTROL PLAN SOUTH TIASA M.G.B WOTE W CITY OF TASA. OKLAHOMA -TERAS