The slope length was set to 250m. For large field areas (assuming 200m field width) an additional soil erosion process b

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

The slope length was set to 250m. For large field areas (assuming 200m field width) an additional soil erosion process b

Post by answerhappygod »

The slope length was set to 250m. For large field areas(assuming 200m field width) an additional soil erosion process bywater typically occurs. That process is not included in theUSLE.
i) Which process is that? ii) Does this process decrease orincrease erosion rates? iii) Why?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply