0 np 31 32 10 8 12 10 11 10 CHARTS FOR 26. A line produces leather jackets. Once each hour a jacket is selected at rando
Posted: Mon Jul 11, 2022 12:15 pm
0 np 31 32 10 8 12 10 11 10 CHARTS FOR 26. A line produces leather jackets. Once each hour a jacket is selected at random from those made during that hour. Small imperfections (missed stitches, zip- per catch, buttons missing, loose threads) are counted. (nonconformities) in each sample. Using the formulas Recent data show an average of eight imperfections for a c chart, calculate the control limits and center- line for this situation. If management wants a process capability of four nonconformities per sample, will this line be able to meet that requirement?