For the data set shown below, complete parts (a) through (d) below. X 20 30 40 50 60 y 100 93 91 85 72 P1 b₁.64 (Round t
Posted: Mon Jul 11, 2022 11:55 am
For the data set shown below, complete parts (a) through (d) below. X 20 30 40 50 60 y 100 93 91 85 72 P1 b₁.64 (Round to two decimal places as needed.) (b) Use technology to compute the standard error, the point estimate for o. Se = 3.3267 (Round to four decimal places as needed.) (c) Assuming the residuals are normally distributed, use technology to determine Sb₁ (Round to four decimal places as needed.) = Sbi