Page 1 of 1

You have been appointed as a junior structural engineer to design a truss bridge across Sungai Kiri with a pin and rolle

Posted: Mon Jul 11, 2022 10:16 am
by answerhappygod
You have been appointed as a junior structural engineer todesign a truss bridge across Sungai Kiri with a pin and rollersupports at point A and G, respectively as shown in Figure Q3 (b).The span of each horizontal member is 4 m and the height ofvertical member is also 4 m. Your task is analyze and present theinfluence diagram for members JK and DE.
You Have Been Appointed As A Junior Structural Engineer To Design A Truss Bridge Across Sungai Kiri With A Pin And Rolle 1
You Have Been Appointed As A Junior Structural Engineer To Design A Truss Bridge Across Sungai Kiri With A Pin And Rolle 1 (40.64 KiB) Viewed 23 times
H B J K C D E 6 panels @ 4 m = 24 m FIGURE Q3 (b) F 77 4 m