Page 1 of 1
(b) You have been appointed as a junior structural engineer to design a truss bridge across Sungai Kiri with a pin and r
Posted: Mon Jul 11, 2022 10:16 am
by answerhappygod

- B You Have Been Appointed As A Junior Structural Engineer To Design A Truss Bridge Across Sungai Kiri With A Pin And R 1 (42.86 KiB) Viewed 29 times
(b) You have been appointed as a junior structural engineer to design a truss bridge across Sungai Kiri with a pin and roller supports at point A and G, respectively as shown in Figure Q3 (b). The span of each horizontal member is 4 m and the height of vertical member is also 4 m. Your task is analyze and present the influence diagram for members JK and DE. (13 marks)
A H B J K C D E 6 panels @ 4 m = 24 m FIGURE Q3 (b) F TN 4m ↓ G_