SKAB2922 WASTEWATER ENGINEERING Assignment 2 Sewage Treatment Plant Design The attached map (Figure 1) shows a proposed
Posted: Mon Jul 11, 2022 10:08 am
SKAB2922 WASTEWATER ENGINEERING Assignment 2 Sewage Treatment Plant Design The attached map (Figure 1) shows a proposed plan of an urban development. You have to: 1) Draw the directions of wastewater flow towards pump stations, or sewage treatment plants, based on the contour lines shown on the map. 2) Propose a location(s) for Sewage Treatment Plant(s) that will serve the developed area. 3) Determine the Population Equivalent (PE) (refer Table 1), average and peak flow rates corresponding to the designated STP(s). Table 1: Population Equivalent (PE) Premise Residential School Hotel Mosque Restaurant Hospital Shopping mall Industrial zone Petrol station, PE 500 people/grey area (building) 1,000 student/school (day schools) 200 rooms 500 people 300 m²/restaurant 350 bed 2,500 m² 2,000 employees 6 bays/station