d to this PC- Search (Alt-03 Mailings Review View Help po Normal No Spacing Heading 1 Find Replac Select Editing 6 a Par

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

d to this PC- Search (Alt-03 Mailings Review View Help po Normal No Spacing Heading 1 Find Replac Select Editing 6 a Par

Post by answerhappygod »

D To This Pc Search Alt 03 Mailings Review View Help Po Normal No Spacing Heading 1 Find Replac Select Editing 6 A Par 1
D To This Pc Search Alt 03 Mailings Review View Help Po Normal No Spacing Heading 1 Find Replac Select Editing 6 A Par 1 (73.38 KiB) Viewed 27 times
d to this PC- Search (Alt-03 Mailings Review View Help po Normal No Spacing Heading 1 Find Replac Select Editing 6 a Paragraph Styles You have been asked by your company to frame a small 10 by 11' office, freestanding in the middle of the warehouse for a floor manager to have a space to do paperwork during the day. The office will not have any windows, but will have a single 3' x 7' door for entry/exit. As the internal project manager, you decide to complete the project with internal staff, but you need to purchase all the materials for this project. Create a Bill of Materials for the project using the following assumptions: Walls are 10' tall with drywall hung on both sides Studs are framed at 16" on center Drywall is mechanically fastened at 12" on center vertical, and into every stud horizontally Drywall is installed vertically and offset staggered Prime and finish coat of paint No new flooring will be installed Electrical and HVAC materials will be purchased and installed by a subcontractor Quantity Total Cost Unit EA EA EA EA EA EA SF EA sssss Cost/Unit $13.48 ea. $7.98 ea. $13.20 ea. $5.97 ea. $2.14 ea. $6.98 ea. $1.54 per SE $64.99 ea. Material Metal Studs (10' length) Top & Bottom Track (10' length) Drywall Boards (4x8 sheets) Drywall Screws (100/box) Joint & Corner Tape (250 LF/toll) Joint Compound (250 LF/qt) Ceiling Grid 2x2 Lay in Ceiling Tile (16 tiles per carton) Paint (350 SF/gallon) Door, Frame, & Hardware Joint Knife Mud Pan Jab Saw Paint Rollers (9) Paint Brush (2-1/2" angle) Paint Roller Frame & Extension GA EA EA EA EA EA EA EA $62 per gallon $650 ea $9.97 ea. $3.97 ea. $7.97 ea. $8.88 ea $14.97 ea $31.97 ea. d to go -
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply