Production (in units) Overhead Variable overhead Fixed overhead Total overhead Flexible Budget at 80% Capacity 52,000 1.

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Production (in units) Overhead Variable overhead Fixed overhead Total overhead Flexible Budget at 80% Capacity 52,000 1.

Post by answerhappygod »

Production In Units Overhead Variable Overhead Fixed Overhead Total Overhead Flexible Budget At 80 Capacity 52 000 1 1
Production In Units Overhead Variable Overhead Fixed Overhead Total Overhead Flexible Budget At 80 Capacity 52 000 1 1 (32.81 KiB) Viewed 53 times
Production (in units) Overhead Variable overhead Fixed overhead Total overhead Flexible Budget at 80% Capacity 52,000 1. Standard overhead rate 2. Standard overhead applied 3 Overhead vanance $ 286,000 52,000 $ 338,000 Actual Results 47,200 $ 331,400 Exercise 21-17 (Algo) Computing standard overhead rate and total overhead variance LO P4 1. Compute the standard overhead rate. Hint Standard allocation base at 80% capacity is 26,000 DLH, computed as 52.000 units Q.5 DLH per unit 2. Compute the standard overhead applied 3. Compute the total overhead variance (Indicate the effect of the variance by selecting favorable, unfavorable, or no variance.)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply