Consider the following table of set of processes, assumed to have arrived at time 0 in the order P1, P2, P3, P4, P5, wit
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Consider the following table of set of processes, assumed to have arrived at time 0 in the order P1, P2, P3, P4, P5, wit
Consider the following table of set of processes, assumed to have arrived at time 0 in the order P1, P2, P3, P4, P5, with the length of the CPU burst given in milliseconds. Process P1 P2 P3 P4 P5 2. Preemptive Priority. CPU burst time 10 1 2 1 5 3. FCFS. Priority 3 1 3 a. Design the flow of processes in a Gantt chart using each of the following algorithm: 1. Shortest job first (SJF). 4 2