nuk 6- Using Meyerhof method for point load determine Quh D=0.5m, closed ended pipe pile SAND $=30° Y=18KN/m³ wg 12m SAN
Posted: Fri Jul 08, 2022 5:52 am
nuk 6- Using Meyerhof method for point load determine Quh D=0.5m, closed ended pipe pile SAND $=30° Y=18KN/m³ wg 12m SAND d=34° Y = 19 KN/M³ SAT FOS=2.5 K=1.5K. 8'=0.654