1-You are hired to install 30m long 0.5m diameter concrete piles in a sand deposit with the following parameters: y = 18
Posted: Fri Jul 08, 2022 5:52 am
1-You are hired to install 30m long 0.5m diameter concrete piles in a sand deposit with the following parameters: y = 18.0kN/m³ p¹= 32 degrees 8' = 0.74" K = 1.5Ko Using equations 12.18, 12.42 and 12.43 find Qp and Q, for this pile. 2-A 30m pile is driven in the deposit shown below, find the following A-Q, per Meyerhof's method B-Qp per Vessic's method m-600 C-Q, per Coyle and Castello's method D-Q. (Eq 12.42 and 12.43) Sand y = 18.0kN/m³ p² = 30 degrees 8' 0.74 K=1.5K, Dense Sand Y-18.0kN/m³ p=42 degrees 30m Pile Diameter = 0.5m