The estimated annual load duration curve to be met by a boiler plant is shown below. Only those hours occurring during t

Posted: Fri Jul 08, 2022 5:52 am
by answerhappygod
The Estimated Annual Load Duration Curve To Be Met By A Boiler Plant Is Shown Below Only Those Hours Occurring During T 1
The Estimated Annual Load Duration Curve To Be Met By A Boiler Plant Is Shown Below Only Those Hours Occurring During T 1 (48.12 KiB) Viewed 26 times
On an annual basis, what is the total number of hours during which at least two boilers must be operated to meet the load
The estimated annual load duration curve to be met by a boiler plant is shown below. Only those hours occurring during the heating season are depicted. The plant will consist of three boilers, each with rated input = 245 kW and rated output = 200 kW. Load (kW) 600 500 400 300 200 100 1000 Load Duration Curve 2000 3000 Hour Number 4000 5000