8. (-/1 Points] DETAILS SERPSE10 18.4.OP.005. MY NOTES PRACTICE ANOTHER The concrete sections of a certain superhighway are designed to have a length of 23.0 m. The sections are poured and cured at 10.0°C. What minimum spacing should the engineer leave between the sections to eliminate buckling if the concrete is to reach a temperature of 45.0°C? (Note: If applicable, Table 1 is available for use in solving this problem.) cm Need Help? Read It Watch It