Page 1 of 1

A precast concrete wall is temporarily kept in its vertical position by ropes (see figure). Find the total force exerted

Posted: Wed Jul 06, 2022 12:38 pm
by answerhappygod
A Precast Concrete Wall Is Temporarily Kept In Its Vertical Position By Ropes See Figure Find The Total Force Exerted 1
A Precast Concrete Wall Is Temporarily Kept In Its Vertical Position By Ropes See Figure Find The Total Force Exerted 1 (15.11 KiB) Viewed 23 times
A precast concrete wall is temporarily kept in its vertical position by ropes (see figure). Find the total force exerted on the pin at position A. The tensions in AB and AC are 370 pounds and 610 pounds, respectively. (Round your answer to one decimal place.) lb DV 180 61