Max Department Product 1 s.t. A B C Department A Department B 1.50 Department C P1, P2, P3 ≥ 0 Max 2.00 0.25 Product 2 D
Posted: Wed Jul 06, 2022 12:27 pm
Max Department Product 1 s.t. A B C Department A Department B 1.50 Department C P1, P2, P3 ≥ 0 Max 2.00 0.25 Product 2 During the next production period, the labor-hours available are 450 in department A, 350 in department B, and 50 in department C. The profit contributions per unit are $23 for product 1, $27 for product 2, and $28 for product 3. 3.00 (a) Formulate a linear programming model for maximizing total profit contribution. (Let P; = units of product i produced, for i = 1, 2, 3.) 1.00 0.25 units of Product 2 produced Product 3 2.00 with profit $ units of Product 3 produced P1, P2, P3 ≥ 0; y1₁, V2, V3 = 0, 1 2.50 (b) Solve the linear program formulated in part (a). How much of each product should be produced, and what is the projected total profit contribution (in dollars)? (P1, P2, P3) = 0.25 (c) After evaluating the solution obtained in part (b), one of the production supervisors noted that production setup costs had not been taken into account. She noted that setup costs are $350 for product 1, $540 for product 2, and $600 for product 3. If the solution developed in part (b) is to be used, what is the total profit contribution (in dollars) after taking into account the setup costs? (d) Management realized that the optimal product mix, taking setup costs into account, might be different from the one recommended in part (b). Formulate a mixed-integer linear program that takes setup costs into account. Management also stated that we should not consider making more than 140 units of product 1, 155 units of product 2, or 170 units of product 3. (Let P; = units of product i produced and y; be the 0-1 variable that is one if any quantity of product i is produced and zero otherwise, for i = 1, 2, 3.) What is the objective function of the mixed-integer linear program? In addition to the constraints from part (a), what other constraints should be added to the mixed-integer linear program? s.t. units of Product 1 produced (e) Solve the mixed-integer linear program formulated in part (d). How much of each product should be produced, and what is the projected total profit (in dollars) contribution? (P1, P2, P3, Y1, Y2₁ Y3) = with profit $