4. (4 points) A 95 kW load operates from a 75Hz 4.8k Vrms with a power factor of 80 percent lagging. Compute the capacit
Posted: Tue Apr 12, 2022 10:12 am
4. (4 points) A 95 kW load operates from a 75Hz 4.8k Vrms with a power factor of 80 percent lagging. Compute the capacitance that must be placed in parallel with the load to achieve a power factor of 95 percent lagging. i. C = 60.1 nF ii. C = 17.5 MF iii. C = 2.74 nF iv. C = 3.67 uF I 5. (4 points) Using the power triangles find the apparent power if the load has a power factor of 85 percent leading and a power of 75kW. i. AP = -142.37 kVA ii. AP = 39.51 kVA iii. AP = -154.75kVA iv. AP = 84.72 kVA