a) Calculate the work done (in J) on a 1601 kg elevator car by its cable to lift it 39.60 m at constant speed, assuming
Posted: Wed Jul 06, 2022 11:22 am
a) Calculate the work done (in J) on a 1601 kg elevator car by its cable to lift it 39.60 m at constant speed, assuming friction averages 107.0 N. b) What is the work done (in J) on the lift by the gravitational force in this process? J c) What is the total work done (in J) on the lift?