Q2: The following table shows the activities of an industrial project N M K B el A Activity GKI L H 4 G 1HGF EDC DEC BAB
Posted: Tue Apr 12, 2022 9:59 am
Q2: The following table shows the activities of an industrial project N M K B el A Activity GKI L H 4 G 1HGF EDC DEC BABA 7 5 2 3 96 2 IF D A previous 3 6 3 T (boom) 1- Draw the network diagram of the project 2- Calculate (Es) and (LC) for the project events 3- Determine the critical path 4- What is the minimum time needed to complete the project?