Page 1 of 1

A12 A15 B2 B9 [QX] 9-22 In a job shop operation, four jobs may be performed on any of four machines. The hours required

Posted: Wed Jul 06, 2022 6:05 am
by answerhappygod
A12 A15 B2 B9 Qx 9 22 In A Job Shop Operation Four Jobs May Be Performed On Any Of Four Machines The Hours Required 1
A12 A15 B2 B9 Qx 9 22 In A Job Shop Operation Four Jobs May Be Performed On Any Of Four Machines The Hours Required 1 (116.98 KiB) Viewed 13 times
A12 A15 B2 B9 [QX] 9-22 In a job shop operation, four jobs may be performed on any of four machines. The hours required for each job on each machine are presented in the following table. The plant supervisor would like to assign jobs so that total time is minimized. Find the best solution. Which assignments should be made? JOB 10 12 9 14 W 14 13 12 16 X MACHINE 16 15 12 18 13 12 11 16 N