Page 1 of 1

As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is

Posted: Wed Jul 06, 2022 6:03 am
by answerhappygod
As The Production Planner For Xiangling Hu Products Inc You Have Been Given A Bill Of Material For A Bracket That Is 1
As The Production Planner For Xiangling Hu Products Inc You Have Been Given A Bill Of Material For A Bracket That Is 1 (28.32 KiB) Viewed 11 times
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 2 springs, and 4 clamps. The base is assembled from 1 clamp and 2 housings. Each clamp has 1 handle and 1 casting. Each housing has 2 bearings and 1 shaft. There is no inventory on hand Click the icon to view the product structure Your boss at Xiangling Hu Products, Inc, has just provided you with the schedule and lead times for the bracket. The unit is to be prepared in week 11. The lead times for the components are bracket (1 week), base (1 week), spring (1 week), clamp (1 week), housing (2 weeks), handle (2 weeks), casting (3 weeks), bearing (1 week), and shaft (1 week) a) Choose the correct time-phased product structure for the bracket OB. OA Han king hande bracke de 10 11 Time in weeks beating handel damp basking Bad san hande tracket damp 10 11 Time in weeks C OC. handle kasting! that song harkste banding bracket 10 11 Time in weeks a G OD harde housing darp tand bracket dame Time in weeks 10 11 C N