Page 1 of 1

Factory Overhead Volume Variance Bellingham Company produced 1,400 units of product that required 4 standard direct labo

Posted: Tue Jul 05, 2022 1:37 pm
by answerhappygod
Factory Overhead Volume Variance Bellingham Company Produced 1 400 Units Of Product That Required 4 Standard Direct Labo 1
Factory Overhead Volume Variance Bellingham Company Produced 1 400 Units Of Product That Required 4 Standard Direct Labo 1 (49.49 KiB) Viewed 8 times
Factory Overhead Volume Variance Bellingham Company produced 1,400 units of product that required 4 standard direct labor hours per unit. The standard fixed overhead cost per unit is $2.05 per direct labor hour at 6,000 hours, which is 100% of normal capacity. Determine the fixed factory overhead volume variance. Enter a favorable variance as a negative number using a minus sign and an unfavorat variance as a positive number. $