Task С Performance Time (mins) 3 1 2 1 9 Predecessors с D, E, F B G.H The theoretical minimum number of workstations who
Posted: Sun Jul 03, 2022 5:23 pm
Task С Performance Time (mins) 3 1 2 1 9 Predecessors с D, E, F B G.H The theoretical minimum number of workstations whole number). a) The correct precedence relationship with one of the possible assignment of tasks to workstations is shown in Fig. 31 The operating efficiency of the assembly line with 3 workstations shown in the figure chosen above 93.3 % (enter your response as a percentage rounded to one decimal place). (round your response up to the next The idle time for the assembly line per cycle minute(s) (enter your response as a whole number). c) If 400 minutes were available, the theoretical minimum number of workstations would (round your response up to the next whole number). The theoretical efficiency (using the cycle time based on 400 minutes available during the day and the theoretical minimum number of workstations) would 70.0% (enter your response as a percentage rounded to one decimal place). Fig. Fig. Fig. Q