A law office currently has five jobs to be scheduled, shown in the order in which they arrived. Job V W X Y N Processing
Posted: Sun Jul 03, 2022 5:22 pm
Calculate Average Flow Time (Total flow time/# of jobs), Average Lateness (Total lateness / # of jobs) and Average Number of Jobs (Total flow time / Total processing time) by sequencing the tasks using Longest Processing Time rule. O AFT = 112.8, AL = 73.8, ANJ = 3.84 O AFT = 12.81, AL = 21.43, ANJ = 2.16 O AFT = 11.1, AL = 8.92, ANJ = 1.16 O AFT = 46.83, AL = 58.37, ANJ = 3.13 O AFT= 28.21, AL = 33.45, ANJ = 3.01