Problem 5A-8 (Algo) High-Low Method; Predicting Cost [LO5-10] Nova Company's total overhead cost at various levels of ac

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Problem 5A-8 (Algo) High-Low Method; Predicting Cost [LO5-10] Nova Company's total overhead cost at various levels of ac

Post by answerhappygod »

Problem 5a 8 Algo High Low Method Predicting Cost Lo5 10 Nova Company S Total Overhead Cost At Various Levels Of Ac 1
Problem 5a 8 Algo High Low Method Predicting Cost Lo5 10 Nova Company S Total Overhead Cost At Various Levels Of Ac 1 (109.12 KiB) Viewed 11 times
Problem 5A-8 (Algo) High-Low Method; Predicting Cost [LO5-10] Nova Company's total overhead cost at various levels of activity are presented below: Month April May June July Machine-Hours 45,000 35,000 55,000 65,000 Assume that the total overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 35,000 machine-hour level of activity is: Utilities (variable) Supervisory salaries (fixed) Maintenance (mixed) Total overhead cost Total Overhead Cost $ 176,800 $152,000 $ 201,600 $ 226,400 Required 1 Nova Company's management wants to break down the maintenance cost into its variable and fixed cost elements. Required: 1. Estimate how much of the $226,400 of overhead cost in July was maintenance cost. (Hint: to do this, it may be helpful to first determine how much of the $226,400 consisted of utilities and supervisory salaries. Think about the behavior of variable and fixed costs.) $49,000 52,000 51,000 $ 152,000 2. Using the high-low method, estimate a cost formula for maintenance in the form Y = a + bx. 3. Express the company's total overhead cost in the form Y = a + bx. 4. What total overhead cost would you expect to be incurred at an activity level of 40,000 machine-hours? Complete this question by entering your answers in the tabs below. Required 2 Required 3 Required 4
Required 1 Required 2 Required 3 Required 4 Estimate how much of the $226,400 of overhead cost in July was maintenance cost. (Hint: to do this, it may be helpful to first determine how much of the $226,400 consisted of utilities and supervisory salaries. Think about the behavior of variable and fixed costs.) (Do not round intermediate calculations.) Maintenance cost in July < Required 1 Required 2 >
Required 1 Required 2 Required 3 Using the high-low method, estimate a cost formula for maintenance in the form Y = a + bX. (Do not round your intermediate calculations. Round the "Variable cost per unit" to 2 decimal places.) Y = Required 4 X < Required 1 Required 3 >
Required 1 Required 2 Required 3 Required 4 Express the company's total overhead cost in the form Y = a + bX. (Do not round your intermediate calculations. Round the "Variable cost per unit" to 2 decimal places.) Utilities cost Supervisory salaries cost Maintenance cost Total overhead cost Y = Variable Cost per Machine- Hour Fixed Cost Required 2 Required 4 >
Required 1 Required 2 Required 3 Required 4 What total overhead cost would you expect to be incurred at an activity level of 40,000 machine-hours? (Do not round intermediate calculations.) Total overhead cost < Required 3 Required 4
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply