1. Input the following design parameters in FPS21 (3 figures below). 2. Run the design and provide the pavement structur
Posted: Sun Jul 03, 2022 12:27 pm
For FPS21 questions, enter thicknesses with only one significant digit (example three and half inches is 3.5 not 3.50), the number of years should be entered as shown in the program (example thirteen years is 13).
Basic Design Criteria LENGTH OF ANALYSIS PERIOD. (Year) MIN TIME TO FIRST OVERLAY. (Year) MIN TIME BETWEEN OVERLAYS. (Year) DESIGN CONFIDENCE LEVEL 80.0% INITIAL SERVICEABILITY INDEX FINAL SERVICEABILITY INDEX SERVICEABILITY INDEX AFTER OVERLAY DISTRICT TEMPERATURE CONSTANT (F) INTEREST RATE (2) Program Controls MAX FUNDS /SQ. YD, INIT CONST MAX THICKNESS, INIT CONST MAX THICKNESS, ALL OVERLAYS Input Design Data 20 10 A 4.5 4.2 31 7.0 99.0 69.0 6.0 Traffic Data ADT, BEGINNING (VEH/DAY] ADT, END 20 YR (VEH/DAY] 18 kip ESAL 20 YR (1 DIA) (millions) AVG APP. SPEED TO OV. ZONE (mph) AVG SPEED, OV. DIRECTION (mph) AVG SPEED, NON-OV. DIRECTION (mph) PERCENT ADT/HR CONSTRUCTION () PERCENT TRUCKS IN ADT (2) To Main Menu 4500 7000 3.000 70. 45. 50 6.0 6.7 X
Construction & Maintenance Data MIN OVERLAY THICKNESS, (Inches) OVERLAY CONST. TIME, HR/DAY ACP COMP. DENSITY, TONS/CY ACP PRODUCTION RATE. TONS/HR WIDTH OF EACH LANE, [Feet] FIRST YEAR COST, RTN MAINT(S) ANN. INC. INCR IN MAINT COST ($) Select Pavement Design Type Input Design Data (Pavement Structure) Detour Design for Overlays DETOUR MODEL DURING OVERLAYS TOTAL NUMBER OF LANES[ for two direction) NUM OPEN LANES, OVRLAY DIRECTION NUM OPEN LANES, NON-OV DIRECTION DIST. TRAFFIC SLOWED. OV DIR DIST TRAFFIC SLOWED, NON-OV DIR 1.5 12.0 1.90 200.0 1) SURFACE TREATED FLEX BASE OVER SUBGRADE FLEX BASE OVER SUBGRADE C2) ACP C31 ACP ASPH STAB BASE OVER SUBGRADE 4) ACP ASPH STAB BASE FLEX BASE OVER SUBGRADE 5) ACP FLEXIBLE BASE STAB SBGR OVER SUBGRADE 6) OVERLAY DESIGN C7) USER DEFINED PAVEMENT (less than 7 layers) Exit Pavement Design Type Selection 12.0 0.0 0.0 E-500 kui v-0.35 ASPH CONC PVMT B E-50 ksi v-0.35 FLEXIBLE BASE C E-35 ksi v-0.30 STABILIZED SUBGR DE-6 kai v-0.40 SUBGRADE (200) 2 1 0.6 0.6 To Main Menu Save to Default Save Input File
Construction & Maintenance Data MIN OVERLAY THICKNESS. (Inches) OVERLAY CONST. TIME, HR/DAY ACP COMP. DENSITY, TONS/CY ACP PRODUCTION RATE, TONS/HR WIDTH OF EACH LANE. (Feet) FIRST YEAR COST. RTN MAINT (5) ANN. INC. INCR IN MAINT COST (S) Design Type Input Design Data (Pavement Structure) Detour Design for Overlays DETOUR MODEL DURING OVERLAYS TOTAL NUMBER OF LANES( for two direction) NUM OPEN LANES, OVRLAY DIRECTION NUM OPEN LANES, NON-OV DIRECTION DIST. TRAFFIC SLOWED, OV DIR DIST TRAFFIC SLOWED. NON-OV DIR MATERIAL NAME LYR 1 ASPH CONC PVMT FLEXIBLE BASE 2 3 STABILIZED SUBGR SUBGRADE (200) 4 1.5 12.0 1.90 200.0 12.0 0.0 0.0 COST PER CY 150.0 54.0 15.0 2.0 MODULUS POISN E (kai) RATIO 500.0 0.35 50.0 0.35 35.0 0.30 6.0 0.40 MIN MAX DEPTH DEPTH 2630 0000 20 6.0 8.0 200.0 2.0 1000 120 8.0 2 0.6 0.6 SALVAGE (331 30.0 75.0 90.0 90.0 To Main Menu Save to Delaut Save Input File