do you know how to get the max demand from this table? (looking for filipino engineers who can explain this in tagalog) thank you
 3
3 (56.95 KiB) Viewed 16 times
POLE NO. 1A 18 1C 1D 1E 1F 1G 1H 11 1J TOTAL A 2 1 3 2 1 2 2 0 2 2 17 NO. AND TYPES OF CUSTOMERS с CLASS STREET LIGHTS B 0 2 1 2 2 1 2 0 1 2 13 1 1 0 0 2 1 1 0 1 7 NUMBER 10 LOADS TOTAL NUMBER MAXIMUM DEMAND D 4 2 1 2 2 0 1 3 3 1 19 LIGHTIN G (A-D) 7 6 5 6 5 5 6 4 6 6 56 0.3 LOAD MOTOR RANGE (CD) (D) 5 4 2 1 2 3 LIGHTING 56 11.76 1 OTHER CUSTOMERS MAXIMUM DEMAND 2 2 2 2 4 3 2 26 TRANSFORMER LOAD MOTOR 26 2 0 1 3 3 1 19 RANGE 19 21.85 W.H. (BD) 4 2.18 SUM OF MAXIMUM DEMAND = 46.63 KVA 4 2 4 4 1 3 3 4 3 32 MAXIMUM DEMAND IN KVA 13.91 16.67 7.60 TOTAL MAXIMUM DEMAND 3.00 11.44 11.18 3.30 8.61 11.84 12.75 8.61 105.91 WATER HEATER 32 7.84