Page 1 of 1

Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direc To

Posted: Fri Jul 01, 2022 8:46 am
by answerhappygod
Dehner Corporation Uses A Job Order Costing System With A Single Plantwide Predetermined Overhead Rate Based On Direc To 1
Dehner Corporation Uses A Job Order Costing System With A Single Plantwide Predetermined Overhead Rate Based On Direc To 1 (61.99 KiB) Viewed 55 times
Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direc Total direct labor-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per direct labor-hour Recently, Job P951 was completed with the following characteristics: Number of units in the job Total direct labor-hours 25 100 $ 700 $ 9,000 The unit product cost for Job P951 is closest to: (Round your Intermediate calculations to 2 decimal places.) Direct materials. Direct labor cost Multiple Choice O $320.40 $420.40 $202.50 90,000 $ 279,000 $ 5.00 O$105.10