Page 1 of 1

Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct l

Posted: Fri Jul 01, 2022 8:45 am
by answerhappygod
Dehner Corporation Uses A Job Order Costing System With A Single Plantwide Predetermined Overhead Rate Based On Direct L 1
Dehner Corporation Uses A Job Order Costing System With A Single Plantwide Predetermined Overhead Rate Based On Direct L 1 (21.54 KiB) Viewed 55 times
Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on the following data: 107,000 $ 406,600 $5.00 Total direct labor-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per direct labor-hour Recently, Job P951 was completed with the following characteristics: Number of units in the job Total direct labor-hours Direct materials Direct labor cost The unit product cost for Job P951 is closest to: (Round your intermediate calculations to 2 decimal places.) 100 100 $ 800 $ 10,700