Page 1 of 1

Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in f

Posted: Fri Jul 01, 2022 8:26 am
by answerhappygod
Williams Optical Inc Is Considering A New Lean Product Cell The Present Manufacturing Approach Produces A Product In F 1
Williams Optical Inc Is Considering A New Lean Product Cell The Present Manufacturing Approach Produces A Product In F 1 (36.39 KiB) Viewed 45 times
Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 67 units. The process time for each step is as follows: Step 1 Process Process Step 2 Process Step 3 Process Step 4 5 minutes 9 minutes 4 minutes The time required to move each batch between steps is 17 minutes. In addition, the time to move raw materials to Process Step 1 is also 17 minutes, and the time to move completed units from Process Step 4 to finished goods inventory is 17 minutes. 7 minutes The new lean layout will allow the company to reduce the batch sizes from 67 units to 4 units. The time required to move each batch between steps and the inventory locations will be reduced to 3 minutes. The processing time in each step will stay the same. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the present and proposed production approaches. If required, round percentages to one decimal place. Present Approach Proposed Approach Value-added time Non-value-added time Total lead time Value-added ratio (as a percent) min min min % min min min %