(a) The total cost for treating material containing 1% copper and 0.015% molybdenum is $18.50/t. At a copper price of $1
Posted: Fri Jul 01, 2022 7:23 am
(a) The total cost for treating material containing 1% copper and 0.015% molybdenum is $18.50/t. At a copper price of $1800/t and molybdenum price of $22.50/kg, determine whether the deposit can be classified as ore or not. 10000 2 5mm and that after grinding