Camp’s Inc. produces two products, X and Z. The bill of materials for these two products is given in the table below. An
Posted: Fri Jul 01, 2022 7:23 am
Camp’s Inc. produces two products, X and Z. The bill ofmaterials for these two products is given in the table below. Anorder for 200 units of X and 50 units of Z has been received forperiod 8. Of the T’s on order, 250 are due in by period 2, 75 S’sshould arrive in period 1.
What is the master production schedule?
Component
Lead Time
Lot Size
Available on Hand
Components
X
1
Lot-for-Lot
25
R (2)
Z
2
Lot-for-Lot
40
T (2); U (3)
R
2
Lot-for-Lot
30
S (1); U (1); T (1)
S
1
Lot-for-Lot
100
U
2
500
120
V (2); W (4)
T
3
Lot-for-Lot
90
V
1
900
150
W
1
1500
160
What is the master production schedule?
Component
Lead Time
Lot Size
Available on Hand
Components
X
1
Lot-for-Lot
25
R (2)
Z
2
Lot-for-Lot
40
T (2); U (3)
R
2
Lot-for-Lot
30
S (1); U (1); T (1)
S
1
Lot-for-Lot
100
U
2
500
120
V (2); W (4)
T
3
Lot-for-Lot
90
V
1
900
150
W
1
1500
160