QUESTION 2 Your company plans to produce a toy with a total of 296,000 units per year. As an engineer, you are required
Posted: Fri Jul 01, 2022 6:57 am
QUESTION 2 Your company plans to produce a toy with a total of 296,000 units per year. As an engineer, you are required to design the assembly line which operates at 8 hours per shift, 2 shifts per day, 5 days per week and 50 weeks per year. Assume 98.66% of uptime efficiency. The assembly line operates with a mechanized conveyor. The repositioning time is 6 sec. Fourteen (14) work elements must be accomplished to complete the assembly. The element times and precedence requirements are listed in the Table Q2. IN Element 1 2 3 5 6 7 8 9 -186 10 11 Table Q2 Te (sec) 12 30 12 36 6 12 18 12 24 18 6 12 6 Must be Preceded by: 1 1 2 3,4 4 5 6,7 9 اونت سیر 12 8, 10 11 13 UNIVERSITI TE18NIKAL MAL 12, 13 A MELAKA (a) Determine the cycle time and the ideal minimum number of stations on the line. (8 marks)
(b) Construct the precedence diagram based on Table Q2. (6 marks) (c) Explain how a perfectly balanced line can be achieved and the difficulties to achieve it. (4 marks) (d) Design the assembly line using any method of your choice. Show necessary steps and the result. Also determine the line balance efficiency (E), balance delay (d), and idle time. (16 marks)
(b) Construct the precedence diagram based on Table Q2. (6 marks) (c) Explain how a perfectly balanced line can be achieved and the difficulties to achieve it. (4 marks) (d) Design the assembly line using any method of your choice. Show necessary steps and the result. Also determine the line balance efficiency (E), balance delay (d), and idle time. (16 marks)