Page 1 of 1
13. Technician A is told to inspect and clean the brush holders and replace the brushes in a DC generator. Which of the
Posted: Fri Jul 01, 2022 6:11 am
by answerhappygod

- 13 Technician A Is Told To Inspect And Clean The Brush Holders And Replace The Brushes In A Dc Generator Which Of The 1 (27.78 KiB) Viewed 22 times

- 13 Technician A Is Told To Inspect And Clean The Brush Holders And Replace The Brushes In A Dc Generator Which Of The 2 (27.4 KiB) Viewed 22 times
13. Technician A is told to inspect and clean the brush holders and replace the brushes in a DC generator. Which of the following areas would the technician be working on in this case? A. The shaft B. The rigging C. The rear end bell O D. The commutator
9. Which of the following types of motors is usually used in machine tools and precision positioning equipment? A. A shunt-wound DC motor B. A series-wound DC motor C. A DC permanent magnet servo motor D. A compound-wound DC motor