Page 1 of 1
(c) A testing had been done on buck converter as open loop system by varying the duty cycle from 0.5 to 0.9. The reading
Posted: Fri Jul 01, 2022 6:00 am
by answerhappygod

- C A Testing Had Been Done On Buck Converter As Open Loop System By Varying The Duty Cycle From 0 5 To 0 9 The Reading 1 (39.39 KiB) Viewed 47 times

- C A Testing Had Been Done On Buck Converter As Open Loop System By Varying The Duty Cycle From 0 5 To 0 9 The Reading 2 (16.35 KiB) Viewed 47 times
(c) A testing had been done on buck converter as open loop system by varying the duty cycle from 0.5 to 0.9. The reading of voltage output is recorded as shown in Table Q3(c). We want to design a controller in the microcontroller. The microcontroller can tolerate the voltage from a sensor in the range of 0V to 3V. CM (i) SHEAIND Duty Cycle - ملاك اوسوم (Output Voltage (V | 0.5 Table Q3(c) 18 UNIVERSITI TEKNIKAL MALAYSIA MELAKA 21 0.6 0.7 0.8 0.9 24 27 30 Discuss in detail how to realize the connection from the buck converter to the microcontroller.
(ii) Based on your answer in (i), choose the best microcontroller between a 6-bit and an 8-bit ADC. Justify your answer. (5 marks) (d) Determine the successive approximation ADC output for a 4-bit converter to a 2.3V input if the voltage input range is 0-3V. (4 marks)