Q1. Based on the table below, solve the questions (1-4). (12 Marks) Activity Predecessor Optimistic Most Likely Pessimis

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899559
Joined: Mon Aug 02, 2021 8:13 am

Q1. Based on the table below, solve the questions (1-4). (12 Marks) Activity Predecessor Optimistic Most Likely Pessimis

Post by answerhappygod »

Q1 Based On The Table Below Solve The Questions 1 4 12 Marks Activity Predecessor Optimistic Most Likely Pessimis 1
Q1 Based On The Table Below Solve The Questions 1 4 12 Marks Activity Predecessor Optimistic Most Likely Pessimis 1 (40.57 KiB) Viewed 86 times
Q1. Based on the table below, solve the questions (1-4). (12 Marks) Activity Predecessor Optimistic Most Likely Pessimistic Duration Duration Duration A 2 4 10 B A 5 8 15 H B 1 2 3 с H 4 10 12 D B 7 9 E с 11 14 21 F DE 9 13 17 G E,F 2 5 7 an- + + 1. What is the probability that the project finishes in less than 40 days. 2. What is the probability that the Activity "G" finishes between 3 and 5 days. 3. Estimate project completion date with at least a 96% confidence level. 4. What is the probability that node "D" has a float more than Zero.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply