Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Urgent! Please refer to the following case study and answer the following two questions. Please adhere to the word limit

Post by answerhappygod »

Urgent!
Please refer to the following case study and answer the
following two questions. Please adhere to the word limit.
step 1--identify the problem with current material
procurement.
step 2- what is the optimal solution, which needs accounting
calculation to support.
Word limit: 300 words
Urgent Please Refer To The Following Case Study And Answer The Following Two Questions Please Adhere To The Word Limit 1
Urgent Please Refer To The Following Case Study And Answer The Following Two Questions Please Adhere To The Word Limit 1 (153.91 KiB) Viewed 32 times
Urgent Please Refer To The Following Case Study And Answer The Following Two Questions Please Adhere To The Word Limit 2
Urgent Please Refer To The Following Case Study And Answer The Following Two Questions Please Adhere To The Word Limit 2 (58.45 KiB) Viewed 32 times
9B16E038 407 ETR HIGHWAY EXTENSION: MATERIAL PROCUREMENT Liana Rintoul, Christoff Boshoff, and Carlos Planelles wrote this case under the supervision of Professor Peter Bel solely to provide material for class discussion. The authors do not intend to Mustrate either effective or ineffective handling of a managerial situation. The authors may have disguised certain names and other identifying information to protect confidentiality This publication may not be transmitted, photocopied, digitized or otherwise reproduced in any form or by any means without the permission of the copyright holder. Reproduction of this material is not covered under authorization by any reproduction nights organization. To order copies or request permission to reproduce materials, contact Ivey Publishing. Ivey Business School, Western University, London, Ontario, Canada, N6G ONT: (1) 519.661.3205; (e) [email protected]; www.iveycases.com. Copyright © 2018, Ivey Business School Foundation Version: 2018-04-30 In April 2016, Carlos Planelles, chairman of the board of the partnership charged with building phase 2 of the $1 billion' Highway 407 east extension, was reviewing an e-mail from the procurement team that recommended the allocation of more than $45 million in contracts for the purchase of granular base material for the highway construction. A few hours after receiving the information, some members of the executive committee responded to the recommendation confirming their acceptance. At the end of the day, all executive committee members but Planelles had accepted the recommendation. Planelles knew that the procurement team had worked for several weeks to negotiate and analyze the suppliers' quotes, but after reviewing the recommendation, Planelles wondered whether the team's recommendation captured the optimal supplier mix and the most cost-effective selection of suppliers. Authorized for use only by katherine Zhao in BFIN431 at Unknown Organization from 1/10/2022 to 4/28/2022 Use outside these parameters is a copyright violation BACKGROUND Ferrovial S.A. (Ferrovial) was a global infrastructure development group based in Madrid, Spain. Ferrovial designed, built, financed, operated, and maintained infrastructure assets around the world. In Ontario, Ferrovial was the majority shareholder of the 407 Express Toll Route (407 ETR) highway, and in 2016, it had completed the phase l extension of Highway 407 east to Oshawa. In 2014, the 407 East Extension Phase 2 project was awarded to a general partnership between Ferrovial and a local construction company for almost $1 billion. The project was a public-private partnership based on a design, build, finance, operate, and maintain model. As this project would require substantial purchases of goods and services, the procurement team included experienced personnel who would be responsible for the procurement strategy, negotiations, and award proposals.
The 407 East Extension Phase 2 was a 25-kilometre (km) highway connecting the existing Highway 407 in Oshawa, Ontario, to Highway 115 in Peterborough, it included a 10 km north-south connector to Highway 401 THE GRANULAR MATERIAL An aggregate material composed of a mixture of sand and rock was used as a base layer under the asphalt on highways. Specific types of the aggregate material had a predetermined size and mix content, which was regulated by the Ministry of Transportation of Ontario. The thickness of the base layer depended on the quantity and size of the expected traffic on the road (see Exhibit 1). There were two types of granular material to be used in the 407 East Extension Project: Granular A and Granular B type 1. Granular B type I was to be used for low-intensity traffic roads and crossing roads, while Granular A was the base for major highways. In Central Ontario, Granular A material was sourced through mining in quarries that were generally located over 80 km from the project, making transportation costs a significant component of the overall cost. In certain projects, suppliers manufactured Granular A in local gravel pits through crushing operations. This process increased the cost of manufacturing but decreased the cost of transportation since the gravel pits were closer to the project. The reduced transportation cost meant that the bid price was still attractive. THE PROCUREMENT PROCESS The procurement department coordinated with the design team, quality assurance, and construction department to prepare a request for quotation (RFQ), which included all technical specifications, key parameters for the required materials, the quantities necessary in each area of the project, and the time when the delivery would be needed. The project was to build 30 km of highway. Costs for trucking were generally calculated per kilometre, so the project was divided into six geographical areas (ci, c2a, c2b, Dla, Dlb, and D2) in order to facilitate trucking cost calculations (see Exhibit 2). Because of the large quantity of material required and because supply was critical for the success of the project, the executive committee had decided that no firm would be awarded more than 50 per cent of the total supply contract. This approach was intended to ensure that no supplier would be in a strong negotiating position to make any changes to the contract after the award. Additionally, the construction department had requested that suppliers provide the manufacturing price and transportation costs separately for each geographical area as there was a possibility to source transport from different trucking companies if that made economic sense. After RFQs were released and submitted to the suppliers, the procurement department met with all suppliers to respond to their questions and suggestions. After the quotes were received on the RFQ closing date, the procurement teams analyzed and assessed them for compliance. Following clarification and negotiation, they met again with the suppliers until they received final compliant prices. Once the procurement department was certain that all compliant quotes had been received and all the RFQ conditions had been met, they issued an award proposal to the project director, who reviewed the proposal Authorized for use only by katherine thain BFIM31 aninown Organization from 1/10/2002 to 4/28/2002 Unide these parameters is a copyright violation
Page 3 9B16E038 and requested approval from the executive committee of the partnership. The executive committee was composed of four people—two from each partner company. In addition to many other roles and responsibilities, the executive committee had to unanimously approve any purchase over $5,000,000. THE DECISION The procurement team received several bids that ranged in price and delivery capabilities. Three suppliers included an option to source and deliver Granular A material from a gravel pit, reducing the transportation cost but increasing the manufacturing cost (see Exhibit 3). Some of the suppliers also imposed restrictions. Supplier 2 could only supply a maximum of 300,000 tons of Granular A from the gravel pit. Supplier 3 offered a 3 per cent discount if the total quantity awarded to them was greater than 600,000 tons. Supplier 4's total maximum capacity was about one million tons, while Supplier 7's total maximum delivery capacity was 300.000 tons. After receiving all the bids, the procurement team worked with the suppliers to clarify and confirm the requirements and final pricing. After analyzing the data, they electronically submitted their recommendation (see Exhibit 4) to the executive committee — the final step before awarding the contracts. By the end of the day, all but one member of the committee had approved the proposal. At first glance, the recommendation looked like it made sense. It was certainly a good solution, but was it a the optimal solution? Planelles was aware that the total contract amount was significant and any savings would go directly to the bottom line. 431 at Unknown Orion from 1/10/2022 to 4/28/2022 rameters is a copy Wolation
EXHIBIT 1: TYPICAL ROADWAY CROSS-SECTION aan Asphalt Pavement Granular Base Subgrade Source: Company files EXHIBIT 2: GEOGRAPHICAL AREAS IN 407 EAST EXTENSION PHASE 2 HOTEL ORAL MAD BARNSTON GLARE TOWN LINE ON HOWWAT C-2b C-2 a C-1 D-1a Authorized for use only by Katherine ha in BFN31 at Unown Organization from 1/10/2022 to 4/28/2022 Use these parameters is copyright violation 應 D-1b D.2 Source: Company files.
EXHIBIT 3: GRANULAR BASE SUPPLY QUOTES: GRANULAR A & GRANULAR B TYPE 1 407 East Extension Phase 2 Project Supplier 1 Siton 7.96 Supplier2 Ston Supplier Son Supplier 4 Suppliers Ston Ston Suplier 6 Sion 7.85 Supplier 7 Ston 6.37 6.75 7.85 6.96 13.30 10.50 10.74 11.64 11.12 12.44 12.70 10.05 10.32 10.50 9.10 9.10 9.10 9.10 10.30 9.25 9.65 11.25 9.50 9.50 9.50 10.25 10.25 10.50 9.50 9.50 9.50 10.25 10.25 10.50 11.00 11.50 12.00 12.00 13.00 13.25 13.00 3.35 3.55 2.60 3.95 4.85 260 9.37 8.50 Manufacturing of Granular A Hauling from Quarry to Segment C1 to Segment Dia to Segment Dib to Segment 2 to Segment Cab to Segment D2 Manufacturing of Granular A Hauling from Gravel PR to Segment C1 to Segment Dla to Segment Db to Segmenta to Segment Cab to Segment 2 Manufacturing of Granular B type 1 Hauling from Query to Segment ci to Segment Dia to Segment 016 to Segment C2 to Segment c2b to Segment D2 4.96 4.46 4.80 4.02 6.00 6.00 5.36 6.00 6.00 5.36 6.25 6.00 6.25 5.25 4.75 6.75 3.73 5.20 3.72 4.52 6.10 6.28 6.18 6.95 14.00 3.35 355 5.71 5.44 5.70 4.60 4.24 4.96 4.46 4.80 4.02 3.73 5.20 9.75 11.65 10.95 9.90 10.30 11.90 6.00 6.00 5.36 6.00 6.00 5.36 4.70 4.70 4.70 3.50 3.50 5.50 200 7.15 6.90 7.15 6.15 5.65 7.65 395 4.85 2.60 Authorized for use only by Katherine Thein BFN31 at Unown Organization from 1/10/2022 to 4/28/2022 Use outside these parameters is acopyright violation 6.34 Qualifications to the quotes: Supplier 2: Granular A from gravel pit delivery capacity was limited to a maximum of 300,000 tons. Supplier 3 total quantity awarded was greater than 600,000 tons, there would be a 3% discount off all the prices. Supplier 4: Maximum capacity to deliver was approximately 1,000,000 tons. Supplier 7. Masumum delivery capacity was 300,000 tons. Source: Company files EXHIBIT 4: GRANULAR BASE PROPOSED AWARD: GRANULAR A & GRANULAR B TYPE 1 Granular A Supplier 2 Supplier 4 Supplier 3 497,941 74,351 Granular B Supplier 2 76.740 48,251 300,000 C1 Dla (Quarry) Dia (Gravel Pit) D1b C2a C2b D2 TOTAL O (ton) 520,675 456,533 507,005 43,256 71055 65.797 58.218 363.315 482.096 1,002,771 572.291 1.263,538 Total Cost $ 9.070,816 S 19,054,929 $ 13,898.4068 3,279,4345 45.303,585 Source: Company files.