It is proposed that a pressure-reducing valve should be replaced by a steam turbine. The .55 investment required is $40,
Posted: Fri Mar 04, 2022 9:34 am
It is proposed that a pressure-reducing valve should be replaced by a steam turbine. The .55 investment required is $40,000. Additional maintenance and operating costs for the turbine is expected to be $1,000 per year. If the annual savings is $9,000, the payback period is 1 نقطة) years 4 O years 4.44 O years 4.45 0 years 5 0