My son plans to add a chilled ammonia CO 2 capture system to his 15 year old pulverized coal plant. The plant has a 608.

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

My son plans to add a chilled ammonia CO 2 capture system to his 15 year old pulverized coal plant. The plant has a 608.

Post by answerhappygod »

My Son Plans To Add A Chilled Ammonia Co 2 Capture System To His 15 Year Old Pulverized Coal Plant The Plant Has A 608 1
My Son Plans To Add A Chilled Ammonia Co 2 Capture System To His 15 Year Old Pulverized Coal Plant The Plant Has A 608 1 (28.06 KiB) Viewed 49 times
My son plans to add a chilled ammonia CO 2 capture system to his 15 year old pulverized coal plant. The plant has a 608.1 MW net nameplate capacity, an 8776 Btu/kWh net heat rate, and a 75% capacity factor. (a) If the chilled ammonia scrubber requires 99.61 MW to operate, what is the new heat rate? Assume that the plant's capacity factor and annual coal consumption remain the same. (b) Does the heat rate change in part (b) reflect an energy penalty or a derating? Why? What is the energy penalty or derating value?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply