Suppose a system for office automation is to be designed. It is clear from requirements that there will be five modules
Posted: Sat Feb 19, 2022 3:22 pm
Suppose a system for office automation is to be designed. It is
clear from requirements that there will be five modules of size 0.5
KLOC, 1.5 KLOC, 2.0 KLOC, 1.0 KLOC, and 2.0 KLOC respectively.
Complexity and reliability requirements are high. Also the
programmers’ capability and experience is low. All other factors
are of normal rating. Use COCOMO model to determine the overall
cost and schedule estimates
clear from requirements that there will be five modules of size 0.5
KLOC, 1.5 KLOC, 2.0 KLOC, 1.0 KLOC, and 2.0 KLOC respectively.
Complexity and reliability requirements are high. Also the
programmers’ capability and experience is low. All other factors
are of normal rating. Use COCOMO model to determine the overall
cost and schedule estimates