9 G H L M N 0 136 B D E Material Requirements Planning Concepts 3 MRP CALCULATIONS 4 6 7 8 9 1 Given the following paren

Posted: Sat Feb 19, 2022 3:06 pm
by answerhappygod
9 G H L M N 0 136 B D E Material Requirements Planning Concepts 3 Mrp Calculations 4 6 7 8 9 1 Given The Following Paren 1
9 G H L M N 0 136 B D E Material Requirements Planning Concepts 3 Mrp Calculations 4 6 7 8 9 1 Given The Following Paren 1 (31.41 KiB) Viewed 64 times
9 G H L M N 0 136 B D E Material Requirements Planning Concepts 3 Mrp Calculations 4 6 7 8 9 1 Given The Following Paren 2
9 G H L M N 0 136 B D E Material Requirements Planning Concepts 3 Mrp Calculations 4 6 7 8 9 1 Given The Following Paren 2 (35.99 KiB) Viewed 64 times
9 G H L M N 0 136 B D E Material Requirements Planning Concepts 3 Mrp Calculations 4 6 7 8 9 1 Given The Following Paren 3
9 G H L M N 0 136 B D E Material Requirements Planning Concepts 3 Mrp Calculations 4 6 7 8 9 1 Given The Following Paren 3 (37.92 KiB) Viewed 64 times
9 G H L M N 0 136 B D E Material Requirements Planning Concepts 3 MRP CALCULATIONS 4 6 7 8 9 1 Given the following parents and components, construct a product structure tree for both finished goods, KS-200 and KS-500, in the space provided below. Figures in parentheses show the quantity per item. (4 marks) Parents KS 200 KS 500 P Q Components P(2) P(3) Q(1) R(3) Q(1) S(2) R(1) S(1) 10 11 12 13 14 15 16 17 18 19 20 P&NN
A с D G N 0 37 sa 3 Prepare MRP Planning sheets for all the parts above (28 marks) 39 4 Complete the exception report on the last page (2 marks) 40 41 12 Week 1 2 3 4 5 6 13 KS-200 400 44 KS 500 100 200 -45 R 50 50 50 15 47 Inventory Open Order 148 Item Master File File Lead Lot Safety Part Time 49 Size Stock Inventory On Order SO KS 200 1 L4L 0 St KS 500 1 L4L 0 52 P 2 100 Q 1 150 100 750 450 WK2 POQ-2 R 2 2500 800 wkt wks S 3 500 1200 300 PART # PARENT 1
A 8 C E F G 0 R 2. D POQ-2 wks 500 2500 R S 800 wk1 3 1200 54 56 50 ST 50 59 1 2. 3 10 31 PART LOT SIZE LEAD TIME ON HAND SAF. STOCK Low level CODE 82 PARENT GROSS REQ. SCHED. RECEIPTS PROJ, INVENTORY NET REO PLAN ORD. RECEIPT PLAN ORD.RELEASE 863 34 65 56 58 es TO PART # LOT SIZE LEAD TIME ON HAND SAF. STOCK Low level CODE 71 72 PARENT GROSS REQ SCHED, RECEIPTS PROJ, INVENTORY NET REQ PLAN ORD. RECEIPT PLAN ORD.RELEASE 78 1 - Inventory Mgmt QUESTION 2. MRP QUESTION