Imaginary axis X 60° Real Axis Figure 6 8. The percent overshoot is less than or equal to: (a) 16.3% (b)9.5% (c) 4.7% (d
Posted: Fri Jan 21, 2022 8:38 am
Imaginary axis X 60° Real Axis Figure 6 8. The percent overshoot is less than or equal to: (a) 16.3% (b)9.5% (c) 4.7% (d) 1.5% 9. The damped frequency Wy is: (a) W, STE (b) , ST/2 (c) ω, Σπ/2 10. The settling time (2% criterion) in seconds is: (d) ω, Σπ (a) T, S 4.4 (b) T, S5.4 (c) T. 6.4 (d) T S 10 11. The point that gives the largest peak time of step-response is point (a) P (b) Q (c) Z 12. The point that gives the smallest natural frequency (,) of step-response is point (d) W (a) P (b) Q (c) Z (d) W