Page 1 of 1

If Cp = 1.2 Cpk = 0.7, what should the Black Belt do first?

Posted: Wed Dec 08, 2021 5:42 am
by answerhappygod
If Cp = 1.2 Cpk = 0.7, what should the Black Belt do first?

Reduce variations
Center the mean
Bring the process in statistical control
The choice of what to do rests with the Black Belt