Sample 1 2 3 4 5 1 8 12 8 10 7 2 11 7 12 9 3 15 12 6 4. 8 Observation (days) 4 5 6 11 8 12 6 11 8 11 7 5 8 14 15 10 10 1

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899559
Joined: Mon Aug 02, 2021 8:13 am

Sample 1 2 3 4 5 1 8 12 8 10 7 2 11 7 12 9 3 15 12 6 4. 8 Observation (days) 4 5 6 11 8 12 6 11 8 11 7 5 8 14 15 10 10 1

Post by answerhappygod »

Sample 1 2 3 4 5 1 8 12 8 10 7 2 11 7 12 9 3 15 12 6 4 8 Observation Days 4 5 6 11 8 12 6 11 8 11 7 5 8 14 15 10 10 1 1
Sample 1 2 3 4 5 1 8 12 8 10 7 2 11 7 12 9 3 15 12 6 4 8 Observation Days 4 5 6 11 8 12 6 11 8 11 7 5 8 14 15 10 10 1 1 (5.61 KiB) Viewed 98 times
Sample 1 2 3 4 5 1 8 12 8 10 7 2 11 7 12 9 3 15 12 6 4. 8 Observation (days) 4 5 6 11 8 12 6 11 8 11 7 5 8 14 15 10 10 14 7 9 12 12 8 13 8 12 8 8 6 15 10
Factors for calculating three-sigma limits for the x-chart and R-chart. Size of Sample Factor for UCL and LCL Factor for LCL for Factor for UCL for (n) for x-chart (A2) R-Chart (D3) R-Chart (D4) 2 1.880 0 3.267 3 1.023 0 2.575 4. 0.729 0 2.282 5 0.577 0 2.115 6 0.483 0 2.004 7 0.419 0.076 1.924 8 0.373 0.136 1.864 9 0.337 0.184 1.816 10 0.308 0.223 1.777
The Digital Guardian Company issues policies that protect clients from downtime costs due to computer system failures. It is very important to process the policies quickly because long cycle times not only put the client at risk, they could also lose business for Digital Guardian. Management is concerned that customer service is degrading because of long cycle times, measured in days. The table contains the data from five samples, each sample consisting of eight random observations. Click the icon to view the table with sample data. Click the icon to view the table of factors for calculating three-sigma limits for the x-chart and R-chart. a. What is your estimate of the process average? The estimate of the process average is I. (Enter your response rounded to two decimal places.) b. What is your estimate of the average range? The estimate of the average range is (Enter your response rounded to two decimal places.) c. Construct an R- and an -chart for this process. Set up the R-chart by specifying the three-sigma control limits below. The UCLR equals and the LCLR equals (Enter your responses rounded to two decimal places.) Set up the x-chart by specifying the three-sigma control limits below. The UCL, equals and the LCL: equals (Enter your responses rounded to two decimal places) The process variability is statistical control and the process average is statistical control.