is to be built through the A roadway mountains cutting slopes and stabilizing them. Soil sample was taken out from top o
Posted: Wed Jun 08, 2022 8:34 am
is to be built through the A roadway mountains cutting slopes and stabilizing them. Soil sample was taken out from top of the mountains for various physical and mechanical testing. Condition of the initial soil sample obtained through boring is given in the figure below, 20 16 00 AKI 15 30 70