6-b) The following results were obtained from a 2.5 kg rammer compaction test on soil which is to be used for the constr
Posted: Wed Jun 08, 2022 7:34 am
6-b) The following results were obtained from a 2.5 kg rammer compaction test on soil which is to be used for the construction of an embankment. 0.001 3.406 Volume of mould (m³) Mass of empty mould (kg) Mass of mould + wet soil (g) 4910 5260 5330 5386 5391 Moisture content (%) 12 15 18 21 24 Determine the maximum dry density (Mg/m³) and the optimum moisture content. [10 marks]